Qualification, Validation & Project Management

Technology System

Qualification, Validation & Project Management

AMH Process Technology for the past 30 years has built up strong experience in validation and qualification of processes and installations.

 

We own a fully dedicated validation and project team, we support both qualification and validation of an installation throughout the lifecycle of a project.

 

AMH Process Technology and project team will be involved in the sales / pre-order phase to meet and come to an agreed URS as well as in safety /ATEX/FM Global assessments and norm compliance during the engineering phase. This involvement continues onto FAST project execution and final validation, including full documentation support as well as final training after successfully testing and commissioning.

Our Standard Documentation :

Project Management Details Master Schedule
Details Project drawings
Quality Plan
Health and Safety list Analysis
Erection and Construction safety Procedure
Process & Instrument Diagram
Function Description
Utilities details requirement
Material Certification list
Pressure Vessel testing and procedure
ATEX / Explosion proof design study
Professional Structural design calculation
Details Logic / Control diagram
Welding documentation
Software / Hardware design
GMP Plan Layout assessment and study process
I/O Details list
IQ/OQ Protocol
FAT/SAT Protocol
Preventive and maintenance spare part list
Operational and Maintenance book